Planning Blog
Since my group and I decided to do a Sprite commercial, our main prop is a Sprite drink. Other props will include a vending machine.
Costumes:
In our commercial, we will have 2 group members as a subject. The actors would wear casual outfits that align with sprite colors (green, yellow, lime green, and white) this includes shoes.
Schedule:
Storyboard - September 28
Filming Blog - September 30 & October 4 (a total of 2)
Editing Blog - October 6 & October 8 ( a total of 2)
Commercial - October 8
CCR (reflection) - October 13
Location List:
Our main location is under the stairwell of the media center, near the vending machine. This will show that Sprite can be found in all places. We would film an actor buying a Sprite.
Our second location will be the hallway between building 505 to the cafeteria. At this location, we film our actor walking and enjoying a sip of Sprite. This will show that Sprite is an energy booster and enjoyable.
Backup Plan:
If the weather is not good or preferable, then our location will be inside of the cafeteria. We would also film an actor sitting down enjoying a sip of Sprite. If one of the members of the group is absent, then the actor would ask for a camerawoman/cameraman, or set the camera for record, film at different angles, and edit the film later.
Comments
Post a Comment